This week's assignment is to create a work breakdown structure (WBS) for the project you selected during Unit 2. This is part of your Course Project.

Instructions:

Don't use plagiarized sources. Get Your Custom Essay on
This week's assignment is to create a work breakdown structure (WBS) for the project you selected during Unit 2. This is part of your Course Project. Instructions: Create a high-level WBS comprised by ella | Nov 14, 2023 | Uncategorized This week's assignment is to create a work breakdown structure (WBS) for the project you selected during Unit 2. This is part of your Course Project. Instructions: Create a high-level WBS comprised of at least three levels: Each level should have with a minimum of five level 1 tasks, with two level 2 tasks, and three (3) Level 3 tasks. Describe each task (work package) in your WBS with just enough information so that everyone in the team can understand what each work package means. Level Numbering: o Your first level of tasks should be numbered 1.0, 2.0, 3.0, 4.0, and 5.0. o Your second level of tasks should be numbered 1.1, 1.2, 2.1, 2.2, etc., o The third level of tasks should be numbered 1.1.1, 1.1.2, 1.1.3, 1.2.1, 1.2.2. 1.2.3 etc. Requirements: Submit a Word document. There is no need to use APA formatting for this assignment

WorkBreakdownStructure.doc

ProjectManagemen1.docx “Place your order now for a similar assignment and have exceptional work written by our team of experts, guaranteeing you A results.” WHY US? Available 24/7 Plagiarism Free Quality Writers Free Revisions All Types of Papers Order Now
Just from $10/Page
Order Essay

Create a high-level WBS comprised of at least three levels:

  • Each level should have with a minimum of five level 1 tasks, with two level 2
    tasks, and three (3) Level 3 tasks.
  • Describe each task (work package) in your WBS with just enough information so
    that everyone in the team can understand what each work package means.
  • Level Numbering:
    o Your first level of tasks should be numbered 1.0, 2.0, 3.0, 4.0, and 5.0. o Your second level of tasks should be numbered 1.1, 1.2, 2.1, 2.2, etc., o The third level of tasks should be numbered 1.1.1, 1.1.2, 1.1.3, 1.2.1,
    1.2.2. 1.2.3 etc.
    Requirements:
  • Submit a Word document.
  • There is no need to use APA formatting for this assignment

“Place your order now for a similar assignment and have exceptional work written by our team of experts, guaranteeing you A results.”

SUPPORT

support@classmatetutor.com

About us

Contact us

User reviews

Become a freelance writer

FAQ’s

OUR SERVICES

 

Persuasive essays

Expository essays

Compare and contrast Essays

Persuasive essays

Argumentative essays

Narrative essays

Definition essays

Informative essays

MAIN

Place order

Our Affiliate program

Privacy Policy

 

LEGAL

Our privacy policy

Terms and conditions

Our Cookie Policy

Confidentiality policy

 

 

Disclaimer: Writemasters is a professional essay writing service, providing custom assistance for research and reference purposes only. The use of our work must comply with all academic guidelines and integrity standards. Copyright © 2009 - 2024
7904 Dorothy St, Rosemead, CA 91770
Open chat
1
Need help? Chat Now
Scan the code
Hello, welcome to our instant WhatsApp chat. We are online and ready to assist.
How can we help you today?